Federal regulation

Radioactive Material Transport Packaging

Part 71 addresses packaging and transportation of radioactive material, including package approval, design and quality assurance. The approved package configuration and authorized contents are central to its use. A package certificate does not authorize an arbitrary material, loading arrangement or operating procedure; these must be assessed against the applicable approval and transport requirements.

Reference
10 CFR Part 71
Source authority
Nuclear Regulatory Commission
Legal character
Binding NRC packaging and transport requirements within the rule’s scope, alongside applicable Department of Transportation obligations.

Start with the material and package category

Identify the radionuclides, physical and chemical form, activity, fissile characteristics and intended transport. These properties influence the applicable package pathway. NRC and Department of Transportation responsibilities intersect, so a transport review should identify both sets of requirements. DOT regulates Type A and smaller-quantity packages, while NRC package approval generally concerns Type B and fissile-material packages under the applicable provisions and exceptions. Determine the category before assuming that an NRC certificate is required.

Read the certificate and its conditions

NRC package certification addresses defined designs and contents. Review the certificate, referenced drawings, authorized contents and operating conditions as a coherent technical package. Changes to seals, shielding, baskets, closure hardware or loading arrangements may affect the approved configuration. A model name on the exterior is insufficient evidence that an individual shipment conforms to the approval.

Translate design requirements into manufacturing controls

Part 71 includes package standards, tests and quality assurance provisions. Manufacturing review should connect material specifications, fabrication procedures and verification records to the approved design. Special attention may be needed for welds, containment boundaries, shielding and closure systems. Retain evidence that the as-built package matches the configuration for which the safety analysis was accepted.

Manage preparation and maintenance

Before use, examine applicable operating, inspection, maintenance and preparation requirements. A package with the correct design can still be unsuitable if damaged, incorrectly assembled or maintained outside its approved instructions. The loading record should establish that the actual contents and preparation steps are within the authorized envelope. Resolve discrepancies before shipment release.

Create a shipment-specific evidence chain

NCQM practice consideration: connect package serial identity, certificate revision, maintenance status, contents characterization, closure verification and shipping documentation. Use a hold point when any of these elements is uncertain. A complete chain makes it possible to investigate a later concern without reconstructing the shipment from isolated commercial documents.

Keep transport and disposal decisions separate

Package approval concerns the authorized transportation use. It does not, by itself, establish acceptance at a storage, processing or disposal facility. Those destinations may impose additional technical and licensing conditions. Consult the current NRC certificate and the relevant transport rules for the specific material rather than treating a previous shipment as permanent authorization.

Official sources

Sources checked 2026-10-19. This is the review date for this profile, separate from any legal effective or compliance date.

  1. Regulatory text

    10 CFR Part 71

    www.ecfr.gov

  2. Agency program

    NRC transportation package certification

    www.nrc.gov